<< Chapter < Page | Chapter >> Page > |
Civil engineers perform important duties in the management of construction projects. Suppose that a civil engineer is charged with the the completion of a construction project. The civil engineer knows that if he (she) hires Subcontractor A to complete the construction project, it will take 10 months. On the other hand, if Subcontractor B is hired, the construction project can be completed in 15 months
Instead of hiring just one of the subcontractor, the civil engineer decides to hire both Subcontractor A and Subcontractor B. By doing so, the civil engineer expects the project to be completed more quickly.
Question: How long will it take both subcontractors working together to complete the construction project?
Let us begin by considering Subcontractor A. Working alone, it would take Subcontractor A 10 months to complete the project. If we consider the completion of the construction project as a job, then Subcontractor A can complete (1/10) of the job in one month. Another way to look at this is that the rate at which Subcontractor A can complete the job is as (1/10) job/month.
Now, let us look at Subcontractor B. Working alone, it would take Subcontractor B 15 months to complete the construction project. Thus Subcontractor B can complete (1/15) of job in one month. The rate of Subcontractor B can be stated as (1/15) job/month
Let us define the variable t
t = the time that it takes to complete the entire job using both of the subcontractors,
where t is measured in months.
In a length of time equal to t , the fraction of the job that Subcontractor A can complete is equal to the product
Similarly the fraction of the job that Subcontractor B can complete in the same length of time is
We may obtain the fraction of the job that can be completed in an interval of time equal to t by adding the fraction associated with the Subcontractor A to that of Subcontractor B, which is
If we set this sum to one, we obtain a rational equation that can be solved to produce the amount of time that it will take both subcontractors working together to complete the entire job
The solution follows
Simplification of this equation yields
From this, we conclude that the two subcontractors working together can complete the job in 6 months.
Question: Suppose that you are interested in taking an automobile trip to visit a friend in Van Horn, Texas. On your journey, you will travel 40 miles inside the City of El Paso. Once you leave the city limits of El Paso, you will have to travel an additional 90 miles to reach Van Horn. Because of traffic, you anticipate that your average speed within the city limits of El Paso will be only half of the average speed once you leave the city limits. You also project that the total time of your trip from El Paso to Van Horn will be 2.5 hours,
What is your average speed within the city limits of El Paso? What would be your average velocity outside the city limits?
Solution: We begin by defining the following variable
x = average speed (miles/hr) within in the city limits of El Paso.
The speed at which you would drive outside the city limits would be twice that of the velocity within the city limits. Thus
2 x = average velocity (miles/hr) outside the city limits of El Paso.
The amount of time that you would spend driving in El Paso would be
The amount of time that you would spend driving outside the city limits would be
If we sum these together we obtain the total time of the trip
This rational equation can be solved as follows
which can be simplified as
We solve this for x to obtain the result of 34 miles/hr. This represents the average speed within the city limits of El Paso. Outside the city limits would be twice that within the city limits or 68 miles/hr.
1. The difference between the reciprocals of two consecutive positive odd integers is 2/15. Find the two positive odd integers.
2. Two pipes (A and B) attach to the top of a holding tank that is part of a waste water processing system. The pipes are of different size. If liquid is supplied to the tank by Pipe A only, it takes 12 minutes to fill the tank. Pipe B has a smaller cross-sectional area than that of pipe A. If liquid is supplied to the tank using Pipe B only, it takes 15 minutes to fill the tank.
A civil engineer is tasked with managing this process. In order to minimize the time needed to fill the tank, the civil engineer decides to supply liquid to the tank via both Pipe A and Pipe B. If this is done, how long will it take to fill the tank?
3. The first leg of Mary’s Spring Break trip consisted of 120 miles of traffic. When the traffic cleared she was able to drive twice as fast for 300 miles. If the total trip took 9 hours, how long was Mary stuck in traffic?
4. Three resistors are connected in parallel. There individual values are 10 Ω, 20 Ω and 50 Ω. What is the equivalent resistance of the parallel combination?
Notification Switch
Would you like to follow the 'Math 1508 (laboratory) engineering applications of precalculus' conversation and receive update notifications?