<< Chapter < Page
  Project management     Page 5 / 8
Chapter >> Page >

Goal setting

Involves establishing specific, measurable and time targeted objectives.

Graphical evaluation and review technique (gert)

A network analysis technique that allows probabilistic treatment of both network logic and activity duration estimated.

Hammock activity

A schedule (project management) or project planning term for a grouping of subtasks that hangs between two end dates it is tied to. or the two end events it is fixed to.

Iso 10006

A guideline for quality management in projects, is an international standard developed by the International Organization for Standardization.

Issue

An issue is a major problem that will impede the progress of the project and that can't be resolved by the project manager and project team without outside help. Project managers should proactively deal with issues through a defined issues management process.

Kickoff meeting

The first meeting with the project team and the client of the project.

Level of effort (loe)

Is qualified as a support type activity which doesn't lend itself to measurement of a discrete accomplishment. Examples of such an activity may be project budget accounting, customer liaison, etc.

Life cycle

Life cycle refers to the process used to build the deliverables produced by the project. Every project has an inception, a period during which activities move the project toward completion, and a termination (either successful or unsuccessful). Taken together, these phases represent the path a project takes from the beginning to its end and are generally referred to as the project life cycle. The project life cycle is often formally divided into phases that describe common activities as the project matures.

Management

In business and human organization activity is simply the act of getting people together to accomplish desired goals. Management comprises planning, organizing, staffing, leading or directing, and controlling an organization (a group of one or more people or entities) or effort for the purpose of accomplishing a goal.

Management process

A process of planning and controlling the performance or execution of any type of activity.

Motivation

Is the set of reasons that determines one to engage in a particular behavior.

Milestone

A milestone is a scheduling event that signifies the completion of a major deliverable or a set of related deliverables. A milestone, by definition, has duration of zero and no effort. There is no work associated with a milestone. It is a flag in the work plan to signify that some other work has completed. Usually, a milestone is used as a project checkpoint to validate how the project is progressing. In many cases there is a decision, such as validating that the project is ready to proceed further, that needs to be made at a milestone.

Objective

An objective is a concrete statement that describes what the project is trying to achieve. The objective should be written at a low level, so that it can be evaluated at the conclusion of a project to see whether it was achieved. Project success is determined based on whether the project objectives were achieved. A technique for writing an objective is to make sure it is specific , measurable , acceptable , realistic , and time based (SMART).

Questions & Answers

A golfer on a fairway is 70 m away from the green, which sits below the level of the fairway by 20 m. If the golfer hits the ball at an angle of 40° with an initial speed of 20 m/s, how close to the green does she come?
Aislinn Reply
cm
tijani
what is titration
John Reply
what is physics
Siyaka Reply
A mouse of mass 200 g falls 100 m down a vertical mine shaft and lands at the bottom with a speed of 8.0 m/s. During its fall, how much work is done on the mouse by air resistance
Jude Reply
Can you compute that for me. Ty
Jude
what is the dimension formula of energy?
David Reply
what is viscosity?
David
what is inorganic
emma Reply
what is chemistry
Youesf Reply
what is inorganic
emma
Chemistry is a branch of science that deals with the study of matter,it composition,it structure and the changes it undergoes
Adjei
please, I'm a physics student and I need help in physics
Adjanou
chemistry could also be understood like the sexual attraction/repulsion of the male and female elements. the reaction varies depending on the energy differences of each given gender. + masculine -female.
Pedro
A ball is thrown straight up.it passes a 2.0m high window 7.50 m off the ground on it path up and takes 1.30 s to go past the window.what was the ball initial velocity
Krampah Reply
2. A sled plus passenger with total mass 50 kg is pulled 20 m across the snow (0.20) at constant velocity by a force directed 25° above the horizontal. Calculate (a) the work of the applied force, (b) the work of friction, and (c) the total work.
Sahid Reply
you have been hired as an espert witness in a court case involving an automobile accident. the accident involved car A of mass 1500kg which crashed into stationary car B of mass 1100kg. the driver of car A applied his brakes 15 m before he skidded and crashed into car B. after the collision, car A s
Samuel Reply
can someone explain to me, an ignorant high school student, why the trend of the graph doesn't follow the fact that the higher frequency a sound wave is, the more power it is, hence, making me think the phons output would follow this general trend?
Joseph Reply
Nevermind i just realied that the graph is the phons output for a person with normal hearing and not just the phons output of the sound waves power, I should read the entire thing next time
Joseph
Follow up question, does anyone know where I can find a graph that accuretly depicts the actual relative "power" output of sound over its frequency instead of just humans hearing
Joseph
"Generation of electrical energy from sound energy | IEEE Conference Publication | IEEE Xplore" ***ieeexplore.ieee.org/document/7150687?reload=true
Ryan
what's motion
Maurice Reply
what are the types of wave
Maurice
answer
Magreth
progressive wave
Magreth
hello friend how are you
Muhammad Reply
fine, how about you?
Mohammed
hi
Mujahid
A string is 3.00 m long with a mass of 5.00 g. The string is held taut with a tension of 500.00 N applied to the string. A pulse is sent down the string. How long does it take the pulse to travel the 3.00 m of the string?
yasuo Reply
Who can show me the full solution in this problem?
Reofrir Reply
Got questions? Join the online conversation and get instant answers!
Jobilize.com Reply

Get Jobilize Job Search Mobile App in your pocket Now!

Get it on Google Play Download on the App Store Now




Source:  OpenStax, Project management. OpenStax CNX. Aug 05, 2016 Download for free at http://legacy.cnx.org/content/col11120/1.10
Google Play and the Google Play logo are trademarks of Google Inc.

Notification Switch

Would you like to follow the 'Project management' conversation and receive update notifications?

Ask