Make an impact with NTT DATA
Join a company that is pushing the boundaries of what is possible. We are renowned for our technical excellence and leading innovations, and for making a difference to our clients and society. Our workplace embraces diversity and inclusion - it's a place where you can grow, belong and thrive.
Your day at NTT DATA
The Sr. construction scheduler is responsible for reviewing /analyzing the General Contractors' schedules and reporting schedule health to the Sr. Manager, Construction Scheduling and other stakeholders. This will include working closely with NTT's Construction Team and General Contractors to ensure scheduling best practices are applied across NTT GDC Americas. The construction scheduler will also assist in analyzing schedule delays by reviewing the General Contractors' Time Impact Analysis. This position will play an important role in providing data driven input to support NTT's predictability. The Sr. Construction Scheduler will be responsible for collecting as built data and working with the scheduling team in developing schedule standards and benchmarks.
What you'll be doing
ESSENTIAL DUTIES & RESPONSIBILITIES
Lead the baseline establishment efforts by partnering with NTT's general contractors.
Review General Contractors' project schedules to identify potential concerns/issues with a focus on mitigation.
Develop monthly internal reports and communicate schedule risks with the project stakeholders.
Create schedule what-if scenarios to influence and drive decision making.
Create and maintain high-level internal schedules and ensure NTT delivers its planned capacity on time.
Implement scheduling best practices and drive standardization across the program.
Develop scheduling key performance indicators and create scheduling dashboards. Communicate schedule health with the project key stakeholders.
Review Time Impact Analysis and provide feedback to the construction team and general contractors.
Partner closely with NTT GDCA preconstruction, design, supply chain, and project management to plan the project and maintain control through the project life cycle.
Lead schedule meetings with the construction team and general contractors.
KNOWLEDGE, SKILLS & ABILITIES
Fully versed in critical path scheduling requirements for construction projects.
Proficient in Primavera P6 scheduling software.
Demonstrated ability to read and interpret construction drawings and specifications to understand, build, and approve/accept schedules produced by contractors.
Experience with earned value management and ability to utilize it in internal reporting.
Experience in reviewing time impact analysis and recovery schedules.
Ability to work on multiple projects and set priorities based on the business needs.
Strong analytical, problem-solving skills.
Capability to multi-task in a fast-paced environment.
Ability to clearly set and lead meetings to develop strong project control systems.
Ability to integrate data from P6 into power BI dashboards.
Ability to be highly confidential.
Proficient with computers to include the utilization of Microsoft programs such as Word, Excel, Power Point and Outlook.
Ability to work in a team environment.
Manages stress and/or fast pace effectively.
Excellent analytical, creative thinking, written and verbal communication skills.
#GlobalDataCentersCareers
EDUCATION & EXPERIENCE
Bachelor's degree in construction management, Business, or Engineering.
10 years' experience with construction scheduling responsibilities, that include schedule development, schedule analysis, earned value analysis, and forensic scheduling.
Experience with Data Centers or high-tech construction projects is preferred.
PSP or PMP certified is preferred.
PHYSICAL REQUIREMENTS
Primarily sitting with some walking, standing, and bending.
Able to hear and speak into a telephone.
Close visual work on a computer terminal.
Dexterity of hands and fingers to operate any required computer keyboard, mouse, and other technical instruments.
Able to lift and carry up to 20 lbs.
Work conditions & other requirements
Standard office; Data Center environment with varying temperatures and loud noises; extensive daily usage of workstation or computer.
Perform work from a remote location with stable internet connection.
Ability to travel up to 25%
Must possess a current, valid state-issued driver's license.
This is a remote position that requires reliable internet connection and electricity. A monthly stipend is provided to cover expenses associated with working remotely and use of a personal mobile device, if applicable.
NTT Global Data Centers Americas, Inc. offers competitive compensation based on experience, education, and location. Base salary for this position is $ 135,500 - $ 193,500.
All regular full-time employees are eligible for an annual bonus; payout is dependent upon individual and company performance.
Employees receive paid time-off, medical, dental, and vision benefits, life and supplemental insurance, short-term and long-term disability, flexible spending account, and 401k retirement plan to create a rich Total Rewards package.
Workplace type:
Remote Working
About NTT DATA
NTT DATA is a $30+ billion trusted global innovator of business and technology services. We serve 75% of the Fortune Global 100 and are committed to helping clients innovate, optimize and transform for long-term success. We invest over $3. 6 billion each year in R&D to help organizations and society move confidently and sustainably into the digital future. As a Global Top Employer, we have diverse experts in more than 50 countries and a robust partner ecosystem of established and start-up companies. Our services include business and technology consulting, data and artificial intelligence, industry solutions, as well as the development, implementation and management of applications, infrastructure, and connectivity. We are also one of the leading providers of digital and AI infrastructure in the world. NTT DATA is part of NTT Group and headquartered in Tokyo.
Equal Opportunity Employer
NTT DATA is proud to be an Equal Opportunity Employer with a global culture that embraces diversity. We are committed to providing an environment free of unfair discrimination and harassment. We do not discriminate based on age, race, colour, gender, sexual orientation, religion, nationality, disability, pregnancy, marital status, veteran status, or a.
US - NH - NH - Wilton
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Amherst
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Farmington
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Chester
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Tilton
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Danville
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Hillsborough
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Franklin
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Deerfield
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Suncook
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - West Lebanon
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Contoocook
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Nottingham
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Lebanon
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Concord
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Seabrook
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Canaan
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Strafford
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Hooksett
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Meredith
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Weare
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Campton
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Londonderry
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Epsom
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Charlestown
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Sanbornville
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...
US - NH - NH - Rye
January 8, 2025
U.S. • Xpress Now Hiring OTR Truck DriversTop Industry Pay, Consistent Miles, 24/7 SupportBenefits: • Drivers can earn trip pay based on a calculation of dispatched miles that ranges from $0.54 to $0.64 cpm (depending on location and experience)Average annual pay would be $61,776 -...